✨ New Arrivals Just Dropped!Explore
HomeStore

night safety long lead - 3M

Product image 1
1 / 5

night safety long lead - 3M

Take your fast and energetic dog for long walks with this sturdy, reflective long leash, that gives you good control over your pup, while allowing them plenty of space to run and explore!

sizes: both measure 3 meters long

  • medium (1.5 cm width)
  • large (2 cm width)

features:

  • 100% polyester
  • signature "puppia" logo
  • hand-made in Korea
Select choose size:
From $39.26

Original: $130.86

-70%
night safety long lead - 3M

$130.86

$39.26

Product Information

Shipping & Returns

Description

Take your fast and energetic dog for long walks with this sturdy, reflective long leash, that gives you good control over your pup, while allowing them plenty of space to run and explore!

sizes: both measure 3 meters long

  • medium (1.5 cm width)
  • large (2 cm width)

features:

  • 100% polyester
  • signature "puppia" logo
  • hand-made in Korea