✨ New Arrivals Just Dropped!Explore
HomeStore

extra long night safety lead - 5M

Product image 1
1 / 4

extra long night safety lead - 5M

Take your fast and energetic dog for long walks with this sturdy, reflective long leash, that gives you good control over your pup, while allowing them plenty of space to run and explore!

sizes: both measure 3 meters long

  • medium (1.5 cm width)
  • large (2 cm width)

features:

  • 100% polyester
  • signature "puppia" logo
  • hand-made in Korea
Select choose size:
From $54.96

Original: $183.21

-70%
extra long night safety lead - 5M

$183.21

$54.96

Product Information

Shipping & Returns

Description

Take your fast and energetic dog for long walks with this sturdy, reflective long leash, that gives you good control over your pup, while allowing them plenty of space to run and explore!

sizes: both measure 3 meters long

  • medium (1.5 cm width)
  • large (2 cm width)

features:

  • 100% polyester
  • signature "puppia" logo
  • hand-made in Korea